Salman Gas Export, Pipelines Integrity Assessment – IOOC

PROJECT DETAILS

In this Project, IOOC intended to implement Pipeline Integrity Management System (PiMS) to improve the safety and reliability of in-scope pipelines. This would be achieved in a phased manner. At the early stages of this project, PTC reviewed IOOC exiting system, and the outcome designed and implemented an integrity management solution.

Also, IOOC requested a systematic proven solution for Integrity Management accepted worldwide.

PTC implemented PiMS for 5 pipelines as bellow:

Sirri-Asalouyeh 32-inches

Sirri-Mubarak 30-inches

KPP-Sirri 30-inches

2SKB-KPP 20-inches

2SKC-KPP 20-inches

Then, mentioned pipelines with all integrity documents and reports run on ParsPiMS software to IOOC analysis.