
PROJECT DETAILS
In this Project, IOOC intended to implement Pipeline Integrity Management System (PiMS) to improve the safety and reliability of in-scope pipelines. This would be achieved in a phased manner. At the early stages of this project, PTC reviewed IOOC exiting system, and the outcome designed and implemented an integrity management solution.
Also, IOOC requested a systematic proven solution for Integrity Management accepted worldwide.
PTC implemented PiMS for 5 pipelines as bellow:
Sirri-Asalouyeh 32-inches
Sirri-Mubarak 30-inches
KPP-Sirri 30-inches
2SKB-KPP 20-inches
2SKC-KPP 20-inches
Then, mentioned pipelines with all integrity documents and reports run on ParsPiMS software to IOOC analysis.